Energy case
The seller's P50 and P90 are reviewed or re-assessed. For operating assets, the operational record is used to check whether the forecast is realistic.
Mergers and acquisitions
Independent technical and energy assessment of wind farms and portfolios for buyers, sellers, and their lenders. Operating assets are judged on their own SCADA or DGR record, development assets on the quality of their wind resource work, and every finding is tied to its effect on value.
The seller's P50 and P90 are reviewed or re-assessed. For operating assets, the operational record is used to check whether the forecast is realistic.
Availability history, turbine-by-turbine performance, failure patterns, and how the fleet's age is likely to affect future output.
Historical grid backdown and curtailment, and whether the forecast treats them realistically for the years ahead.
O&M scope, availability guarantees, warranty expiry dates, and power curve terms, checked against the energy case. Legal review stays with counsel.
Life extension needs and repowering potential, which can add value at older sites on good wind land.
Measurement quality, long-term correction, layout maturity, and the gaps that must be closed before the project is bankable.
| Deal stage | Typical scope | Output |
|---|---|---|
| Screening and non-binding offer | Desktop red-flag review of the data room and the seller's energy reports | Short memo: key value drivers, main risks, and questions for the seller |
| Binding offer | Full technical review with re-assessed P50/P90 and operating analysis | Technical due diligence report with an adjusted energy case for the valuation model |
| Acquisition financing | Lender-ready energy case and support for the lender's technical advisor | Report and spreadsheet outputs, with answers to lender questions |
| Sale process (sell-side) | Vendor due diligence prepared before the data room opens | Vendor technical report that bidders and their lenders can rely on |
Wind portfolios often mix turbine models, ages, states, and data quality. Indian portfolios in particular can combine modern machines with assets commissioned in the 2000s, where only DGR data is available.
Yes. Reviewing the existing report and testing its key assumptions is usually the most efficient starting point, with a full re-assessment only where the review shows it is needed.
Yes. A vendor due diligence report prepared before the sale gives every bidder the same technical basis and reduces the number of questions during the process.
The review works with what is available, from 10-minute SCADA to monthly generation reports, and states clearly where limited data widens the uncertainty on value.
It depends on the deal stage, the number of assets, and the state of the data room. The scope and timeline are agreed at the scoping call to fit the bid deadline.
Yes. Adjusted P50 and P90 energy figures, availability, and loss assumptions are delivered in spreadsheet form for the financial model.
Share the deal stage, the number of assets, and your bid timeline, and a scoping call will set out the review and a fixed fee.