Performance trend
Production and power curves are tracked year by year to measure any decline from blade wear, component ageing, or control changes.
Repowering and life extension
Older wind farms hold years of SCADA history. This assessment uses it to measure how the existing turbines are really performing, then compares the energy, P50, and P90 of each option: continuing as is, extending life, partially repowering, or fully repowering.
Before comparing options, the baseline has to be right. The existing fleet's SCADA or DGR data shows what the site actually delivers today, and how fast it is declining.
Production and power curves are tracked year by year to measure any decline from blade wear, component ageing, or control changes.
Downtime is broken down by turbine and cause, showing whether failures are becoming more frequent and which machines drive the losses.
Turbine-by-turbine results show which positions perform best. That matters when deciding which turbines to replace first.
A forward P50 and P90 for keeping the existing turbines, with ageing losses and rising downtime applied explicitly.
The old fleet's record is used to calibrate the wind climate and wake model, so every scenario starts from measured site behaviour rather than a desktop estimate.
| Scenario | What changes | What the assessment reports |
|---|---|---|
| Run on | Existing turbines continue with normal maintenance | Forward P50/P90 with ageing and availability decline |
| Life extension | Refurbishment of key components to keep the fleet running longer | Recovered availability and performance, and the energy over the extended life |
| Partial repowering | The weakest or best-sited positions are replaced; the rest run on | Combined P50/P90, including wake between new and old turbines |
| Full repowering | A new layout with modern turbines on taller towers | New-layout P50/P90, hub-height shear, wake, and IEC 61400-1 suitability |
Usually, yes. Older sites often have gaps, missing channels, or only DGR data. The assessment uses what is reliable, documents what is excluded, and widens the uncertainty where the data is weak.
For the new hub height, a tall mast or LiDAR campaign is strongly recommended, because old turbines measure the wind far below modern hub heights. The old-fleet data then anchors the long-term wind climate.
Old and new turbines are modelled together, because large new rotors change the wake that the remaining old turbines receive, and the old turbines affect the new ones.
The assessment covers energy and performance. Structural and load-based life assessment is specialist work by the OEM or a certification body; the SCADA and wind-climate results can be supplied as inputs to it.
Yes. Each scenario is reported with its uncertainty budget and assumptions documented, so it can support financing of the repowering or life extension project.
Share the turbine type, years of SCADA or DGR data, and the options you are considering, and a scoping call will set out the assessment and a fixed fee.