European wind EYA built for lender review.

Independent energy yield assessment for European onshore, offshore, repowering, and acquisition cases. Outputs include P50/P75/P90 net AEP, uncertainty budget, wake treatment, MCP evidence, IEC suitability, and model-ready assumptions.

P50/P75/P90debt and equity
Wake + lossesgross-to-net
SCADAoperational reset

What the EYA resolves

Uncertainty and exceedance

Measurement, long-term, spatial, wake, and future-loss uncertainty are propagated into defendable P50/P75/P90 cases.

Wake and curtailment

Dense layouts, neighbouring projects, grid curtailment, noise/environmental curtailment, and future loss assumptions are separated.

Operational reconciliation

For existing assets, SCADA, availability, curtailment, and prior EYA assumptions are bridged into an operational P50 reset.

Deliverables

  • P50, P75, and P90 net AEP by project, cluster, and WTG where data allows.
  • Uncertainty budget with source justification and sensitivity cases.
  • Wake-model and flow-model assumption memo.
  • Executive summary for IC, lender, or acquirer review.