Sample report
See the proof layer before you scope the job.
Review the kind of redacted WRA and EYA outputs a lender, IPP, or technical advisor expects: WTG-wise AEP, uncertainty, MCP, IEC site suitability, and wake-layout evidence.
WTG-wise P50 / P75 / P90 output example
Representative, redacted structure only. A real report includes the complete turbine list, coordinates, source assumptions, and versioned model notes.
| WTG | Hub wind speed | Gross AEP | Wake loss | Net AEP P50 | P75 | P90 | Review flag |
|---|---|---|---|---|---|---|---|
| WTG-017 | 8.14 m/s | 18.6 GWh | 7.8% | 15.9 GWh | 14.8 GWh | 13.7 GWh | Cluster wake sensitivity |
| WTG-042 | 8.32 m/s | 19.4 GWh | 5.9% | 17.1 GWh | 15.9 GWh | 14.7 GWh | Clean position |
| WTG-063 | 7.91 m/s | 17.8 GWh | 9.6% | 14.8 GWh | 13.8 GWh | 12.7 GWh | Ridge and wake overlap |
| WTG-088 | 8.05 m/s | 18.1 GWh | 6.4% | 15.7 GWh | 14.6 GWh | 13.5 GWh | Terrain transfer check |
MCP correlation evidence
Example output: monthly climate shape, mast-vs-reference fit, residuals, and selected long-term correction window.
IEC 61400 site suitability matrix
| Parameter | Site value | OEM envelope | Status | Action in report |
|---|---|---|---|---|
| Vave at hub height | 8.2 m/s | IEC IIIA platform limit | Pass | Documented at WTG level |
| 50-year extreme wind V50 | 38.9 m/s | 42.5 m/s | Pass | Extreme value appendix |
| Turbulence intensity | Category B/C edge | OEM Class B curve | Review | OEM load review recommended for 11 WTGs |
| Shear and veer | 0.19 alpha, seasonal veer | Project-specific | Review | Rotor-equivalent wind speed sensitivity |
| Air density | 1.11 kg/m3 | Power curve correction range | Pass | Net AEP correction applied |
Wake and micrositing visual
A bankable layout review should show where wake, terrain transfer, access constraints, and WTG-specific uncertainty change the decision. The output below represents the kind of before/after evidence included in a redacted review pack.
- Base layout wake loss: 8.4% net AEP impact.
- Optimized layout wake loss: 6.7% after turbine-position changes.
- Commercial delta: 1.7 percentage points before financing case lock.
Use the form to request the sample
Tell me what type of report you want to review and who it is for. The answer helps send the right sample and avoids a chain of clarification emails.
Helpful context
- WRA, EYA, met mast QC, or due diligence.
- Developer, lender, sponsor, or technical advisor.
- Any deadline you are working against.
- If you also want a scoping call, say so.
Need the sample before a committee meeting?
Say that in the request. The work can be scoped around the decision deadline rather than around a generic marketing timeline.